{"id":50888,"date":"2020-06-30T10:35:36","date_gmt":"2020-06-30T08:35:36","guid":{"rendered":"https:\/\/www.cadlan.com\/en\/?p=50888"},"modified":"2022-01-07T10:59:28","modified_gmt":"2022-01-07T09:59:28","slug":"cens-new-data-center-implementation","status":"publish","type":"post","link":"https:\/\/www.cadlan.com\/en\/noticias\/cens-new-data-center-implementation\/","title":{"rendered":"We take part of CEN\u00b4S new data center implementation"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column]<div id=\"ultimate-heading-18506a68f40e16f8e\" class=\"uvc-heading ult-adjust-bottom-margin ultimate-heading-18506a68f40e16f8e uvc-9084 accent-title-color accent-icon-color uvc-heading-default-font-sizes\" data-hspacer=\"no_spacer\"  data-halign=\"left\" style=\"text-align:left\"><div class=\"uvc-heading-spacer no_spacer\" style=\"top\"><\/div><div class=\"uvc-main-heading ult-responsive\"  data-ultimate-target='.uvc-heading.ultimate-heading-18506a68f40e16f8e h2'  data-responsive-json-new='{\"font-size\":\"\",\"line-height\":\"\"}' ><h2 style=\"--font-weight:theme;\">We have been awarded the specialties for the construction of the new Data Center of the National Electric Coordinator (CEN) of Chile by Ferrovial<\/h2><\/div><\/div><div class=\"gap\" style=\"line-height: 20px; height: 20px;\"><\/div>[vc_column_text]<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-50889\" src=\"https:\/\/www.cadlan.com\/en\/wp-content\/uploads\/2022\/01\/data_center_CEN_chile_cadlan.jpg\" alt=\"\" width=\"1024\" height=\"435\" srcset=\"https:\/\/www.cadlan.com\/en\/wp-content\/uploads\/2022\/01\/data_center_CEN_chile_cadlan.jpg 1024w, https:\/\/www.cadlan.com\/en\/wp-content\/uploads\/2022\/01\/data_center_CEN_chile_cadlan-300x127.jpg 300w, https:\/\/www.cadlan.com\/en\/wp-content\/uploads\/2022\/01\/data_center_CEN_chile_cadlan-768x326.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>[\/vc_column_text][vc_column_text]The new Data Center, on which work has just begun, will enable\u00a0<a href=\"https:\/\/www.coordinador.cl\/\" target=\"_blank\" rel=\"noopener noreferrer\">CEN<\/a> to manage all electricity production and transmission in the country.[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]<\/p>\n<h3><strong>Project<\/strong><\/h3>\n<p>Our collaboration in the project includes the following specialties:<\/p>\n<ul>\n<li><strong>Electrical installation:<\/strong> generator sets, electrical panels, and UPS.<\/li>\n<li><strong>Weak currents:<\/strong> data cabling and fiber optics.<\/li>\n<li>Air conditioning.<\/li>\n<li><strong>BMS<\/strong> and Power Monitoring centralized control system.<\/li>\n<li><strong>Equipment:<\/strong> racks, PDU&#8217;s and video walls for the control room.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_column_text]<\/p>\n<h3>Requirements<\/h3>\n<p>The data processing center, with<strong> TIER III topology<\/strong>, must meet all the reliability and redundancy requirements necessary to guarantee the 99.982% availability required by the Uptime Institute standard.<\/p>\n<p>To this, the necessary redundancies are provided to carry out the maintenance work without interrupting the service. Continuity is also ensured in the event of an unexpected failure of any infrastructure element or system or any other unplanned activity, such as a natural disaster or fire.[\/vc_column_text][vc_column_text]<\/p>\n<h3>Trusted partners<\/h3>\n<p>To develop this project we have the <strong>support and trust<\/strong> of the main manufacturers in the sector: Schneider Electric, Vertiv, APC, CommScope, Perkins, LG, Cisco, or HPE; regular collaborators in all our Data Center projects.[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Aspectos b\u00e1sicos sobre Microsoft 365<\/p>\n","protected":false},"author":4,"featured_media":50890,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"image","meta":{"footnotes":""},"categories":[107],"tags":[4558,4559,4561,4560,4562],"yst_prominent_words":[11235,7378,936,306,3430,523,3134,13204,13058,12549],"class_list":["post-50888","post","type-post","status-publish","format-image","has-post-thumbnail","hentry","category-noticias","tag-big-data","tag-iot","tag-machine-learning","tag-retail","tag-transformacion-digital","post_format-post-format-image","category-107","description-off"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.cadlan.com\/en\/wp-json\/wp\/v2\/posts\/50888","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cadlan.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cadlan.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cadlan.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cadlan.com\/en\/wp-json\/wp\/v2\/comments?post=50888"}],"version-history":[{"count":4,"href":"https:\/\/www.cadlan.com\/en\/wp-json\/wp\/v2\/posts\/50888\/revisions"}],"predecessor-version":[{"id":50894,"href":"https:\/\/www.cadlan.com\/en\/wp-json\/wp\/v2\/posts\/50888\/revisions\/50894"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cadlan.com\/en\/wp-json\/wp\/v2\/media\/50890"}],"wp:attachment":[{"href":"https:\/\/www.cadlan.com\/en\/wp-json\/wp\/v2\/media?parent=50888"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cadlan.com\/en\/wp-json\/wp\/v2\/categories?post=50888"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cadlan.com\/en\/wp-json\/wp\/v2\/tags?post=50888"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/www.cadlan.com\/en\/wp-json\/wp\/v2\/yst_prominent_words?post=50888"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}